Line 2A (Yellow)

Mumbai Metro · 17 Stations · 18.6 km

About the Line 2A (Yellow)

Runs along the Link Road, connecting Dahisar East to DN Nagar in Andheri West.

History

Part of the massive expansion plan by MMRDA, Line 2A opened in phases between 2022 and 2023.

Stations on this Line

Frequently Asked Questions

Q: Is Line 2A fully operational?

Yes, it is now fully operational from Dahisar East to Andheri West.

Travel Tips

  • Transfer to Line 7 at Dahisar East.
  • Very convenient for residents of Borivali and Kandivali.

Line Statistics

Total Stations17
Route Length18.6 km
Year Opened2022