Line 2B (Yellow)

Mumbai Metro · 20 Stations · 23.6 km

About the Line 2B (Yellow)

An eastern extension of the Yellow Line, connecting DN Nagar to Mandale.

History

Construction began alongside Line 2A, with the first phase opening in early 2026.

Stations on this Line

Travel Tips

  • Provides a direct link to the Diamond Garden and Mankhurd areas.

Line Statistics

Total Stations20
Route Length23.6 km
Year Opened2026