Line 3 (Aqua)

Mumbai Metro System

27 Stations
33.5 km
Est. 2024
28 Accessible

About the Line 3 (Aqua)

The first fully underground metro line in Mumbai, connecting Colaba to SEEPZ via BKC and the Airport.

History

Line 3, also known as the Aqua Line, is Mumbai's first fully underground metro corridor. Spanning 33.5 km from Colaba to SEEPZ, it tunnels through the city's most densely populated and historically sensitive areas. It was a monumental engineering feat involving tunneling under the Mithi River and alongside heritage structures in South Mumbai. The line is designed to decongest the overburdened suburban railway and provide direct metro access to the business district of BKC and both airport terminals.

Stations on this Line

28 stops along the route

StationInterchangeTerminal

Line Statistics

Total Stations27
Route Length33.5 km
Year Opened2024
Accessible Stations28

Travel Tips

  • 1Direct Airport Access: This is the only line that takes you directly into the terminal buildings of CSMIA (T1 and T2).
  • 2The BKC station is one of the largest underground stations in India, serving the city's premier business district.
  • 3Follow the floor markings for smooth interchanges at Marol Naka (with Line 1).

Frequently Asked Questions

Everything you need to know about the Line 3 (Aqua) in Mumbai.

QDoes Line 3 serve both airport terminals?

Yes, Line 3 has dedicated underground stations at Airport Terminal 1 (Domestic) and Airport Terminal 2 (International).

QIs Line 3 fully operational?

Line 3 is being opened in phases. The first phase from Aarey to BKC is operational, with the full corridor to Colaba opening soon.

QIs the Aqua Line air-conditioned?

Yes, like all Mumbai Metro lines, Line 3 is fully air-conditioned and features advanced humidity control for underground environments.