Line 5 (Orange)

Mumbai Metro System

15 Stations
24.9 km
Est. 2027
16 Accessible

Line Statistics

Total Stations15
Route Length24.9 km
Year Opened2027
Accessible Stations16

Travel Tips

  • 1This will become a major alternative to crowded road corridors into Bhiwandi and Kalyan.
  • 2Kapurbawdi is the key future interchange with Line 4.
  • 3Kalyan station will matter for onward rail and Metro Line 12 connectivity.

Frequently Asked Questions

Everything you need to know about the Line 5 (Orange) in Mumbai.

QHow many stations are on Line 5?

Current official MMRDA project material lists 15 stations on Line 5.

QWhat is the main purpose of Line 5?

It is meant to improve fast public transport between Thane, Bhiwandi and Kalyan while connecting into the wider metro network.